Difference between revisions of "Matrix of Implementation Examples"
m (Text replacement - "<center>'''SEBoK v. 2.3, released 30 October 2020'''</center>" to "<center>'''SEBoK v. 2.4, released 19 May 2021'''</center>") |
|||
(28 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
− | The following matrix maps the | + | ---- |
+ | '''''Lead Authors:''''' ''Heidi Davidz, Alice Squires, Tom Hilburn'', '''''Contributing Authors:''''' ''Alex Lee, John Brackett, Richard Turner'' | ||
+ | ---- | ||
+ | The following matrix maps the [[Systems Engineering Implementation Examples]] to topics in the [[SEBoK Table of Contents|Systems Engineering Body of Knowledge (SEBoK)]]. It provides both a list of systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset is included here for clarity. For additional information, see the example of interest and the corresponding SEBoK topic. | ||
− | ==Organization and Mapping of | + | ==Organization and Mapping of Examples to the SEBoK== |
− | The following short titles shown in Table 1 | + | The following short titles shown in Table 1 are used for the implementation examples: |
{| align="center" | {| align="center" | ||
− | |+'''Table 1. Short Titles for the SEBoK | + | |+'''Table 1. Short Titles for the SEBoK Examples.''' (SEBoK Original) |
|- | |- | ||
! scope="col" colspan="2" | Case Studies | ! scope="col" colspan="2" | Case Studies | ||
Line 44: | Line 47: | ||
|'''CAS''' | |'''CAS''' | ||
|Complex Adaptive Operating System | |Complex Adaptive Operating System | ||
+ | |- | ||
+ | |'''PM''' | ||
+ | |Project Management | ||
+ | |- | ||
+ | |'''TS''' | ||
+ | |Taxi Service | ||
+ | |- | ||
+ | |'''SWFTS''' | ||
+ | |SWFTS MBSE | ||
+ | |- | ||
+ | |'''Bag Handling''' | ||
+ | |Denver Airport Baggage Handling System | ||
+ | |- | ||
+ | |'''VA Sub''' | ||
+ | |Virginia Class Submarine | ||
+ | |- | ||
+ | |'''Route Mod''' | ||
+ | |UK West Coast Route Modernisation Project | ||
+ | |- | ||
+ | |'''Water Mgmt''' | ||
+ | |Singapore Water Management | ||
+ | |- | ||
+ | |'''FAA AAS''' | ||
+ | |FAA Advanced Automation System | ||
+ | |- | ||
+ | |'''Light Rail''' | ||
+ | |Standard Korean Light Transit System | ||
+ | |- | ||
+ | |'''TMT''' | ||
+ | |Thirty-Meter Telescope | ||
|} | |} | ||
− | Table 2 shows how the topics (each row) align with the | + | Table 2 shows how the topics (each row) align with the first set of implementation examples (each column): |
{| align="center" | {| align="center" | ||
− | |+'''Table 2. Implementation Examples.''' | + | |+'''Table 2. Implementation Examples based on published case studies.''' (SEBoK Original) |
− | !SEBoK Topic | + | !SEBoK Topic |
!BT | !BT | ||
!ATC | !ATC | ||
Line 63: | Line 96: | ||
!DfM | !DfM | ||
!CAS | !CAS | ||
+ | !PM | ||
+ | !TS | ||
+ | !SWFTS | ||
+ | !NHS | ||
|- | |- | ||
|[[Systems Thinking]] | |[[Systems Thinking]] | ||
Line 77: | Line 114: | ||
!X | !X | ||
!X | !X | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
|- | |- | ||
− | |Models and Simulation | + | |[[Representing Systems with Models|Models and Simulation]] |
| | | | ||
!X | !X | ||
Line 90: | Line 131: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
| | | | ||
|- | |- | ||
Line 105: | Line 150: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
|- | |- | ||
|[[Service Systems Engineering]] | |[[Service Systems Engineering]] | ||
Line 119: | Line 168: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
|- | |- | ||
|[[Enterprise Systems Engineering]] | |[[Enterprise Systems Engineering]] | ||
Line 133: | Line 186: | ||
| | | | ||
| | | | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
|- | |- | ||
|[[Systems of Systems (SoS)]] | |[[Systems of Systems (SoS)]] | ||
Line 147: | Line 204: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
|- | |- | ||
|[[Life Cycle Models]] | |[[Life Cycle Models]] | ||
Line 161: | Line 222: | ||
!X | !X | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
|- | |- | ||
|[[Business or Mission Analysis]] | |[[Business or Mission Analysis]] | ||
Line 172: | Line 237: | ||
!X | !X | ||
| | | | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | !X | ||
!X | !X | ||
| | | | ||
Line 188: | Line 257: | ||
!X | !X | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
| | | | ||
|- | |- | ||
Line 202: | Line 275: | ||
!X | !X | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
| | | | ||
|- | |- | ||
Line 215: | Line 292: | ||
!X | !X | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 231: | Line 312: | ||
| | | | ||
!X | !X | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[System Implementation]] | |[[System Implementation]] | ||
Line 244: | Line 329: | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 258: | Line 347: | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 271: | Line 364: | ||
!X | !X | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 285: | Line 382: | ||
!X | !X | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 300: | Line 401: | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 315: | Line 420: | ||
!X | !X | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
|- | |- | ||
|[[System Maintenance]] | |[[System Maintenance]] | ||
Line 329: | Line 438: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
|- | |- | ||
|[[Logistics]] | |[[Logistics]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 355: | Line 472: | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | | | ||
| | | | ||
| | | | ||
Line 369: | Line 490: | ||
!X | !X | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
| | | | ||
| | | | ||
Line 385: | Line 510: | ||
| | | | ||
!X | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[Measurement]] | |[[Measurement]] | ||
Line 396: | Line 525: | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 413: | Line 546: | ||
| | | | ||
!X | !X | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[Configuration Management]] | |[[Configuration Management]] | ||
Line 427: | Line 564: | ||
!X | !X | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[Information Management]] | |[[Information Management]] | ||
Line 441: | Line 582: | ||
| | | | ||
!X | !X | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[Quality Management]] | |[[Quality Management]] | ||
Line 454: | Line 599: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
| | | | ||
|- | |- | ||
Line 469: | Line 618: | ||
!X | !X | ||
!X | !X | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
+ | | | ||
|- | |- | ||
|[[Related Disciplines]] | |[[Related Disciplines]] | ||
Line 483: | Line 636: | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
|} | |} | ||
− | + | Table 3 shows how the topics (each row) align with the second set of implementation examples (each column): | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
{| align="center" | {| align="center" | ||
− | |+'''Table | + | |+'''Table 3. Implementation Examples Developed for SEBoK.''' (SEBoK Original) |
!SEBoK Topic (Part 3) | !SEBoK Topic (Part 3) | ||
!Bag Handling | !Bag Handling | ||
Line 702: | Line 834: | ||
---- | ---- | ||
− | <center>[[Systems Engineering Implementation Examples|< Previous Article]] | [[Systems Engineering Implementation Examples|Parent Article]] | [[ | + | <center>[[Systems Engineering Implementation Examples|< Previous Article]] | [[Systems Engineering Implementation Examples|Parent Article]] | [[Implementation Examples|Next Article >]]</center> |
+ | |||
+ | <center>'''SEBoK v. 2.4, released 19 May 2021'''</center> | ||
[[Category: Part 7]] | [[Category: Part 7]] | ||
− |
Revision as of 08:01, 18 May 2021
Lead Authors: Heidi Davidz, Alice Squires, Tom Hilburn, Contributing Authors: Alex Lee, John Brackett, Richard Turner
The following matrix maps the Systems Engineering Implementation Examples to topics in the Systems Engineering Body of Knowledge (SEBoK). It provides both a list of systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset is included here for clarity. For additional information, see the example of interest and the corresponding SEBoK topic.
Organization and Mapping of Examples to the SEBoK
The following short titles shown in Table 1 are used for the implementation examples:
Case Studies | |
---|---|
BT | Business Transformation |
ATC | NextGen Air Traffic Control |
NASA | NASA's Mission to Saturn |
HST | Hubble Space Telescope |
GPS | Global Positioning System |
GPS II | Global Positioning System II |
Radiation | Medical Radiation |
FBI VCF | FBI Virtual Case File System |
MSTI | Miniature Seeker Technology Integration |
Infusion Pump | Next Generation Medical Infusion Pump |
DfM | Design for Maintainability |
CAS | Complex Adaptive Operating System |
PM | Project Management |
TS | Taxi Service |
SWFTS | SWFTS MBSE |
Bag Handling | Denver Airport Baggage Handling System |
VA Sub | Virginia Class Submarine |
Route Mod | UK West Coast Route Modernisation Project |
Water Mgmt | Singapore Water Management |
FAA AAS | FAA Advanced Automation System |
Light Rail | Standard Korean Light Transit System |
TMT | Thirty-Meter Telescope |
Table 2 shows how the topics (each row) align with the first set of implementation examples (each column):
Table 3 shows how the topics (each row) align with the second set of implementation examples (each column):
SEBoK Topic (Part 3) | Bag Handling | VA Sub | Route Mod | Water Mgmt | FAA AAS | Light Rail |
---|---|---|---|---|---|---|
Business or Mission Analysis | X | X | X | |||
Stakeholder Needs and Requirements | X | X | X | |||
System Requirements | X | X | X | |||
System Architecture | X | X | X | X | X | |
System Analysis | X | X | X | X | ||
System Implementation | X | |||||
System Integration | X | X | X | |||
System Verification | X | X | X | |||
System Validation | X | X | X | |||
System Deployment | X | |||||
Operation of the System | X | X | ||||
System Maintenance | X | |||||
Logistics | X | |||||
Planning | X | X | X | X | X | |
Assessment and Control | X | X | ||||
Risk Management | X | X | X | X | X | |
Measurement | X | |||||
Decision Management | X | X | X | |||
Configuration Management | X | X | X | |||
Information Management | X | |||||
Quality Management | X |
References
Works Cited
None.
Primary References
None.
Additional References
None.