Difference between revisions of "Matrix of Implementation Examples"
m (Text replacement - "<center>'''SEBoK v. 2.3, released 30 October 2020'''</center>" to "<center>'''SEBoK v. 2.4, released 19 May 2021'''</center>") |
|||
(37 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
− | The following matrix maps the | + | ---- |
+ | '''''Lead Authors:''''' ''Heidi Davidz, Alice Squires, Tom Hilburn'', '''''Contributing Authors:''''' ''Alex Lee, John Brackett, Richard Turner'' | ||
+ | ---- | ||
+ | The following matrix maps the [[Systems Engineering Implementation Examples]] to topics in the [[SEBoK Table of Contents|Systems Engineering Body of Knowledge (SEBoK)]]. It provides both a list of systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset is included here for clarity. For additional information, see the example of interest and the corresponding SEBoK topic. | ||
− | ==Organization and Mapping of | + | ==Organization and Mapping of Examples to the SEBoK== |
− | The following short titles shown in Table 1 | + | The following short titles shown in Table 1 are used for the implementation examples: |
{| align="center" | {| align="center" | ||
− | |+'''Table 1. Short Titles for the SEBoK | + | |+'''Table 1. Short Titles for the SEBoK Examples.''' (SEBoK Original) |
|- | |- | ||
! scope="col" colspan="2" | Case Studies | ! scope="col" colspan="2" | Case Studies | ||
Line 41: | Line 44: | ||
|'''DfM''' | |'''DfM''' | ||
|Design for Maintainability | |Design for Maintainability | ||
− | |||
− | |||
− | |||
|- | |- | ||
|'''CAS''' | |'''CAS''' | ||
|Complex Adaptive Operating System | |Complex Adaptive Operating System | ||
+ | |- | ||
+ | |'''PM''' | ||
+ | |Project Management | ||
+ | |- | ||
+ | |'''TS''' | ||
+ | |Taxi Service | ||
+ | |- | ||
+ | |'''SWFTS''' | ||
+ | |SWFTS MBSE | ||
+ | |- | ||
+ | |'''Bag Handling''' | ||
+ | |Denver Airport Baggage Handling System | ||
+ | |- | ||
+ | |'''VA Sub''' | ||
+ | |Virginia Class Submarine | ||
+ | |- | ||
+ | |'''Route Mod''' | ||
+ | |UK West Coast Route Modernisation Project | ||
+ | |- | ||
+ | |'''Water Mgmt''' | ||
+ | |Singapore Water Management | ||
+ | |- | ||
+ | |'''FAA AAS''' | ||
+ | |FAA Advanced Automation System | ||
+ | |- | ||
+ | |'''Light Rail''' | ||
+ | |Standard Korean Light Transit System | ||
+ | |- | ||
+ | |'''TMT''' | ||
+ | |Thirty-Meter Telescope | ||
|} | |} | ||
− | Table 2 shows how the topics (each row) align with the | + | Table 2 shows how the topics (each row) align with the first set of implementation examples (each column): |
{| align="center" | {| align="center" | ||
− | |+'''Table 2. Implementation Examples.''' | + | |+'''Table 2. Implementation Examples based on published case studies.''' (SEBoK Original) |
− | !SEBoK Topic | + | !SEBoK Topic |
!BT | !BT | ||
!ATC | !ATC | ||
Line 65: | Line 95: | ||
!Infusion Pump | !Infusion Pump | ||
!DfM | !DfM | ||
− | |||
!CAS | !CAS | ||
+ | !PM | ||
+ | !TS | ||
+ | !SWFTS | ||
+ | !NHS | ||
|- | |- | ||
− | |[[ | + | |[[Systems Thinking]] |
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
| | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
| | | | ||
| | | | ||
+ | |- | ||
+ | |[[Representing Systems with Models|Models and Simulation]] | ||
| | | | ||
+ | !X | ||
+ | !X | ||
| | | | ||
| | | | ||
+ | !X | ||
| | | | ||
| | | | ||
Line 81: | Line 132: | ||
| | | | ||
| | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
| | | | ||
+ | |- | ||
+ | |[[Product Systems Engineering]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
|- | |- | ||
|[[Service Systems Engineering]] | |[[Service Systems Engineering]] | ||
Line 89: | Line 161: | ||
| | | | ||
| | | | ||
+ | !X | ||
| | | | ||
| | | | ||
Line 96: | Line 169: | ||
| | | | ||
| | | | ||
+ | !X | ||
| | | | ||
+ | !X | ||
|- | |- | ||
|[[Enterprise Systems Engineering]] | |[[Enterprise Systems Engineering]] | ||
Line 104: | Line 179: | ||
| | | | ||
| | | | ||
+ | !X | ||
| | | | ||
| | | | ||
Line 110: | Line 186: | ||
| | | | ||
| | | | ||
+ | !X | ||
+ | !X | ||
| | | | ||
− | + | !X | |
|- | |- | ||
|[[Systems of Systems (SoS)]] | |[[Systems of Systems (SoS)]] | ||
Line 119: | Line 197: | ||
| | | | ||
| | | | ||
+ | !X | ||
| | | | ||
| | | | ||
Line 126: | Line 205: | ||
| | | | ||
| | | | ||
+ | !X | ||
| | | | ||
+ | !X | ||
|- | |- | ||
|[[Life Cycle Models]] | |[[Life Cycle Models]] | ||
Line 132: | Line 213: | ||
| | | | ||
| | | | ||
+ | !X | ||
+ | !X | ||
| | | | ||
| | | | ||
| | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
| | | | ||
| | | | ||
− | + | !X | |
− | |||
− | |||
− | |||
| | | | ||
|- | |- | ||
Line 149: | Line 233: | ||
| | | | ||
| | | | ||
+ | !X | ||
| | | | ||
+ | !X | ||
| | | | ||
!X | !X | ||
+ | | | ||
| | | | ||
!X | !X | ||
− | + | !X | |
| | | | ||
| | | | ||
Line 162: | Line 249: | ||
!X | !X | ||
| | | | ||
+ | !X | ||
| | | | ||
+ | !X | ||
| | | | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
| | | | ||
| | | | ||
!X | !X | ||
− | |||
!X | !X | ||
− | |||
!X | !X | ||
| | | | ||
Line 185: | Line 275: | ||
!X | !X | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
!X | !X | ||
| | | | ||
Line 194: | Line 287: | ||
| | | | ||
!X | !X | ||
− | + | !X | |
| | | | ||
| | | | ||
Line 200: | Line 293: | ||
!X | !X | ||
| | | | ||
− | + | | | |
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 214: | Line 310: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
| | | | ||
| | | | ||
− | |||
|- | |- | ||
|[[System Implementation]] | |[[System Implementation]] | ||
Line 227: | Line 326: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
| | | | ||
| | | | ||
Line 236: | Line 338: | ||
!X | !X | ||
| | | | ||
+ | !X | ||
!X | !X | ||
!X | !X | ||
Line 241: | Line 344: | ||
| | | | ||
| | | | ||
+ | !X | ||
| | | | ||
!X | !X | ||
| | | | ||
+ | !X | ||
!X | !X | ||
| | | | ||
Line 260: | Line 365: | ||
!X | !X | ||
| | | | ||
− | + | | | |
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 269: | Line 377: | ||
| | | | ||
!X | !X | ||
− | + | !X | |
!X | !X | ||
| | | | ||
Line 275: | Line 383: | ||
!X | !X | ||
| | | | ||
− | + | | | |
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 284: | Line 395: | ||
| | | | ||
!X | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
+ | !X | ||
| | | | ||
| | | | ||
| | | | ||
− | |||
| | | | ||
| | | | ||
Line 299: | Line 413: | ||
| | | | ||
!X | !X | ||
− | + | !X | |
| | | | ||
| | | | ||
Line 307: | Line 421: | ||
| | | | ||
| | | | ||
+ | !X | ||
+ | | | ||
+ | !X | ||
|- | |- | ||
|[[System Maintenance]] | |[[System Maintenance]] | ||
Line 322: | Line 439: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
|- | |- | ||
|[[Logistics]] | |[[Logistics]] | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 349: | Line 472: | ||
| | | | ||
!X | !X | ||
+ | | | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 363: | Line 489: | ||
!X | !X | ||
!X | !X | ||
+ | | | ||
| | | | ||
| | | | ||
+ | !X | ||
!X | !X | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 374: | Line 503: | ||
!X | !X | ||
!X | !X | ||
− | + | !X | |
!X | !X | ||
!X | !X | ||
Line 382: | Line 511: | ||
!X | !X | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[Measurement]] | |[[Measurement]] | ||
Line 393: | Line 525: | ||
| | | | ||
!X | !X | ||
+ | | | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 412: | Line 547: | ||
!X | !X | ||
!X | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[Configuration Management]] | |[[Configuration Management]] | ||
Line 418: | Line 556: | ||
| | | | ||
| | | | ||
− | + | !X | |
− | + | !X | |
| | | | ||
| | | | ||
Line 426: | Line 564: | ||
!X | !X | ||
!X | !X | ||
− | + | | | |
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[Information Management]] | |[[Information Management]] | ||
Line 442: | Line 583: | ||
!X | !X | ||
!X | !X | ||
+ | !X | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|[[Quality Management]] | |[[Quality Management]] | ||
Line 456: | Line 600: | ||
| | | | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | !X | ||
| | | | ||
|- | |- | ||
Line 461: | Line 608: | ||
| | | | ||
| | | | ||
− | + | !X | |
− | |||
− | |||
− | |||
− | |||
− | |||
| | | | ||
+ | !X | ||
+ | !X | ||
| | | | ||
| | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
| | | | ||
+ | !X | ||
| | | | ||
|- | |- | ||
Line 479: | Line 629: | ||
| | | | ||
| | | | ||
+ | !X | ||
+ | !X | ||
+ | !X | ||
| | | | ||
+ | !X | ||
| | | | ||
− | + | !X | |
− | |||
| | | | ||
| | | | ||
Line 490: | Line 643: | ||
− | + | Table 3 shows how the topics (each row) align with the second set of implementation examples (each column): | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
{| align="center" | {| align="center" | ||
− | |+'''Table | + | |+'''Table 3. Implementation Examples Developed for SEBoK.''' (SEBoK Original) |
!SEBoK Topic (Part 3) | !SEBoK Topic (Part 3) | ||
!Bag Handling | !Bag Handling | ||
Line 706: | Line 834: | ||
---- | ---- | ||
− | <center>[[Systems Engineering Implementation Examples|< Previous Article]] | [[Systems Engineering Implementation Examples|Parent Article]] | [[ | + | <center>[[Systems Engineering Implementation Examples|< Previous Article]] | [[Systems Engineering Implementation Examples|Parent Article]] | [[Implementation Examples|Next Article >]]</center> |
+ | |||
+ | <center>'''SEBoK v. 2.4, released 19 May 2021'''</center> | ||
[[Category: Part 7]] | [[Category: Part 7]] | ||
− |
Revision as of 08:01, 18 May 2021
Lead Authors: Heidi Davidz, Alice Squires, Tom Hilburn, Contributing Authors: Alex Lee, John Brackett, Richard Turner
The following matrix maps the Systems Engineering Implementation Examples to topics in the Systems Engineering Body of Knowledge (SEBoK). It provides both a list of systems engineering implementation examples for topics of interest, and a list of relevant topics for each implementation example. Since the number of topics in the SEBoK is extensive, only a subset is included here for clarity. For additional information, see the example of interest and the corresponding SEBoK topic.
Organization and Mapping of Examples to the SEBoK
The following short titles shown in Table 1 are used for the implementation examples:
Case Studies | |
---|---|
BT | Business Transformation |
ATC | NextGen Air Traffic Control |
NASA | NASA's Mission to Saturn |
HST | Hubble Space Telescope |
GPS | Global Positioning System |
GPS II | Global Positioning System II |
Radiation | Medical Radiation |
FBI VCF | FBI Virtual Case File System |
MSTI | Miniature Seeker Technology Integration |
Infusion Pump | Next Generation Medical Infusion Pump |
DfM | Design for Maintainability |
CAS | Complex Adaptive Operating System |
PM | Project Management |
TS | Taxi Service |
SWFTS | SWFTS MBSE |
Bag Handling | Denver Airport Baggage Handling System |
VA Sub | Virginia Class Submarine |
Route Mod | UK West Coast Route Modernisation Project |
Water Mgmt | Singapore Water Management |
FAA AAS | FAA Advanced Automation System |
Light Rail | Standard Korean Light Transit System |
TMT | Thirty-Meter Telescope |
Table 2 shows how the topics (each row) align with the first set of implementation examples (each column):
Table 3 shows how the topics (each row) align with the second set of implementation examples (each column):
SEBoK Topic (Part 3) | Bag Handling | VA Sub | Route Mod | Water Mgmt | FAA AAS | Light Rail |
---|---|---|---|---|---|---|
Business or Mission Analysis | X | X | X | |||
Stakeholder Needs and Requirements | X | X | X | |||
System Requirements | X | X | X | |||
System Architecture | X | X | X | X | X | |
System Analysis | X | X | X | X | ||
System Implementation | X | |||||
System Integration | X | X | X | |||
System Verification | X | X | X | |||
System Validation | X | X | X | |||
System Deployment | X | |||||
Operation of the System | X | X | ||||
System Maintenance | X | |||||
Logistics | X | |||||
Planning | X | X | X | X | X | |
Assessment and Control | X | X | ||||
Risk Management | X | X | X | X | X | |
Measurement | X | |||||
Decision Management | X | X | X | |||
Configuration Management | X | X | X | |||
Information Management | X | |||||
Quality Management | X |
References
Works Cited
None.
Primary References
None.
Additional References
None.