Technical Performance Measure (TPM) (glossary): Difference between revisions
m (Text replacement - "SEBoK v. 2.11, released 25 November 2024" to "SEBoK v. 2.12, released 20 May 2025") |
m (Text replacement - "SEBoK v. 2.12, released 20 May 2025" to "SEBoK v. 2.12, released 27 May 2025") |
||
Line 12: | Line 12: | ||
[[Category:Glossary of Terms]] | [[Category:Glossary of Terms]] | ||
<center>'''SEBoK v. 2.12, released | <center>'''SEBoK v. 2.12, released 27 May 2025'''</center> |
Latest revision as of 23:49, 23 May 2025
(1) Measures of attributes of a system element within the system to determine how well the system or system element is satisfying specified requirements. (Roedler and Jones 2005, 1-65)
(2) A product design assessment, which estimates, through engineering analysis and tests, the values of essential performance parameters of the current design as effected by risk handling actions. (BMP 2012)
Source
(1) Roedler, G. J., and C. Jones. 2005. Technical Measurement: A Collaborative Project of PSM, INCOSE, and Industry. San Diego, CA, USA: Practical Software & Systems Management (PSM)/International Council on Systems Engineering (INCOSE), INCOSE-TP-2003-020-01.
(2) BMP. 2012. "2.8 Risk Monitoring." Accessed September 13, 2012. Available at: http://www.bmpcoe.org/library/books/dsmc%20rmg%204th/69.html.
Discussion
None.