System Definition (glossary): Difference between revisions

From SEBoK Draft
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
''<blockquote>-A set of corre technical activities of systems engineering, including the activities that are completed primarily in the front-end portion of the system design.  These consist of mission analysis and stakeholders requirements, system requirements, architectural design, and system analysis.</blockquote>''
''<blockquote>A set of core technical activities of [[Systems Engineering (glossary)]], including the activities that are completed primarily in the front-end portion of the system design.  These consist of mission analysis and stakeholders requirements, system requirements, architectural design, and system analysis.</blockquote>''


====Source====
====Source====

Revision as of 13:32, 14 September 2011

A set of core technical activities of systems engineering , including the activities that are completed primarily in the front-end portion of the system design. These consist of mission analysis and stakeholders requirements, system requirements, architectural design, and system analysis.

Source

None cited.

Discussion