People Capability Maturity Model (P-CMM): Difference between revisions
Jump to navigation
Jump to search
m (Text replacement - "SEBoK v. 2.11, released 25 November 2024" to "SEBoK v. 2.12, released 20 May 2025") |
m (Text replacement - "<center>'''SEBoK v. 2.12, released 27 May 2025'''</center>" to "") |
||
(One intermediate revision by one other user not shown) | |||
Line 7: | Line 7: | ||
To read an overview of this source, see the [http://www.sei.cmu.edu/library/abstracts/reports/01mm001.cfm SEI website]. | To read an overview of this source, see the [http://www.sei.cmu.edu/library/abstracts/reports/01mm001.cfm SEI website]. | ||
[[Category:Primary Reference]] | [[Category:Primary Reference]] |
Latest revision as of 16:33, 18 September 2025
Curits, B., W.E. Hefley, and S.A. Miller. 2001. People Capability Maturity Model (P-CMM), Version 2.0. Pittsburg, PA, USA: Software Engineering Institute (SEI). CMU/SEI-2001-MM-01. Accessed on June 8, 2012. Available at http://www.sei.cmu.edu/library/abstracts/reports/01mm001.cfm
Usage
This source is considered a primary reference for the Team Capability article.
Annotation
To read an overview of this source, see the SEI website.