People Capability Maturity Model (P-CMM): Difference between revisions

From SEBoK Draft
Jump to navigation Jump to search
m (Text replacement - "{{DISQUS}}" to "SEBoK v. 1.9.1 released 5 October 2018")
m (Text replacement - "<center>'''SEBoK v. 2.12, released 27 May 2025'''</center>" to "")
 
(16 intermediate revisions by 3 users not shown)
Line 7: Line 7:
To read an overview of this source, see the [http://www.sei.cmu.edu/library/abstracts/reports/01mm001.cfm SEI website].
To read an overview of this source, see the [http://www.sei.cmu.edu/library/abstracts/reports/01mm001.cfm SEI website].


SEBoK v. 1.9.1 released 5 October 2018
 


[[Category:Primary Reference]]
[[Category:Primary Reference]]

Latest revision as of 16:33, 18 September 2025

Curits, B., W.E. Hefley, and S.A. Miller. 2001. People Capability Maturity Model (P-CMM), Version 2.0. Pittsburg, PA, USA: Software Engineering Institute (SEI). CMU/SEI-2001-MM-01. Accessed on June 8, 2012. Available at http://www.sei.cmu.edu/library/abstracts/reports/01mm001.cfm

Usage

This source is considered a primary reference for the Team Capability article.

Annotation

To read an overview of this source, see the SEI website.

SEBoK v. 2.13, released 17 November 2025