SEBoK Draft:Books/SEBoK Glossary and Acronyms: Difference between revisions
Jump to navigation
Jump to search
(3 intermediate revisions by the same user not shown) | |||
Line 8: | Line 8: | ||
;Glossary | ;Glossary | ||
;A | ;A | ||
:[[ | :[[Absorption (glossary)]] | ||
:[[Abstract Model ( | :[[Abstract Model (glossary)]] | ||
:[[ | :[[Abstract Syntax (glossary)]] | ||
:[[ | :[[Abstraction (glossary)]] | ||
:[[ | :[[Acceptance Criteria (glossary)]] | ||
:[[ | :[[Acceptance Sampling (glossary)]] | ||
:[[ | :[[Acquirer (glossary)]] | ||
:[[ | :[[Acquisition (glossary)]] | ||
:[[ | :[[Acquisition Strategy (glossary)]] | ||
:[[ | :[[Adaptability (glossary)]] | ||
:[[ | :[[Address (glossary)]] | ||
:[[ | :[[Adversity (glossary)]] | ||
:[[ | :[[Aggregate (glossary)]] | ||
:[[ | :[[Agile (glossary)]] | ||
:[[ | :[[Agility (glossary)]] | ||
:[[ | :[[Agreement (glossary)]] | ||
:[[ | :[[Analytical Model (glossary)]] | ||
:[[ | :[[Antipattern (glossary)]] | ||
:[[ | :[[Architecting (glossary)]] | ||
:[[ | :[[Architecture (glossary)]] | ||
:[[ | :[[Architecture Framework (glossary)]] | ||
:[[ | :[[Assembly Procedure (glossary)]] | ||
:[[ | :[[Assembly Tool (glossary)]] | ||
:[[ | :[[Assessment Criterion (glossary)]] | ||
:[[ | :[[Assessment Score (glossary)]] | ||
:[[ | :[[Attribute (glossary)]] | ||
:[[ | :[[Availability (glossary)]] | ||
;B | ;B | ||
:[[ | :[[Baseline (glossary)]] | ||
:[[ | :[[Behavior (glossary)]] | ||
:[[ | :[[Behavioral Architecture (glossary)]] | ||
:[[ | :[[Binding (glossary)]] | ||
:[[ | :[[Black-Box System (glossary)]] | ||
:[[ | :[[Body of Knowledge (glossary)]] | ||
:[[ | :[[Boundary (glossary)]] | ||
:[[ | :[[Business (glossary)]] | ||
:[[ | :[[Business Process (glossary)]] | ||
:[[ | :[[Business Process Outsourcing (glossary)]] | ||
;C | ;C | ||
:[[ | :[[Call Center (glossary)]] | ||
:[[ | :[[Capability (glossary)]] | ||
:[[ | :[[Capability Management (glossary)]] | ||
:[[ | :[[Capacity (glossary)]] | ||
:[[ | :[[Cartesian coordinate system (glossary)]] | ||
:[[ | :[[Cartography (glossary)]] | ||
:[[ | :[[Case Study (glossary)]] | ||
:[[ | :[[Catalogue (glossary)]] | ||
:[[ | :[[Chaos (glossary)]] | ||
:[[ | :[[Closed System (glossary)]] | ||
:[[ | :[[Coercive (glossary)]] | ||
:[[ | :[[Cognitive Bias (glossary)]] | ||
:[[ | :[[Cohesion (glossary)]] | ||
:[[ | :[[Competency (glossary)]] | ||
:[[ | :[[Complex (glossary)]] | ||
:[[ | :[[Complex Adaptive System (CAS) (glossary)]] | ||
:[[ | :[[Complexity (glossary)]] | ||
:[[ | :[[Complexity avoidance (glossary)]] | ||
:[[ | :[[Component (glossary)]] | ||
:[[ | :[[Computer Simulation (glossary)]] | ||
:[[ | :[[Concept (glossary)]] | ||
:[[ | :[[Concept Definition (glossary)]] | ||
:[[ | :[[Concept of Operations (ConOps) (glossary)]] | ||
:[[ | :[[Concrete Syntax (glossary)]] | ||
:[[ | :[[Concurrent (glossary)]] | ||
:[[ | :[[Concurrently (glossary)]] | ||
:[[ | :[[Configuration (glossary)]] | ||
:[[ | :[[Configuration Management (glossary)]] | ||
:[[ | :[[Constraint (glossary)]] | ||
:[[ | :[[Control (glossary)]] | ||
:[[ | :[[Coordinate (glossary)]] | ||
:[[ | :[[Cost (glossary)]] | ||
:[[ | :[[Critical Design Review (CDR) (glossary)]] | ||
:[[ | :[[Critical Systems Thinking (glossary)]] | ||
:[[ | :[[Culture (glossary)]] | ||
:[[ | :[[Customer (glossary)]] | ||
:[[ | :[[Cyber-Physical Systems (glossary)]] | ||
:[[ | :[[Cybernetics (glossary)]] | ||
:[[ | :[[Cycle (glossary)]] | ||
;D | ;D | ||
:[[ | :[[Data Center (glossary)]] | ||
:[[ | :[[Decision Gate (glossary)]] | ||
:[[ | :[[Decision Management (glossary)]] | ||
:[[ | :[[Defense in depth (glossary)]] | ||
:[[ | :[[Demonstration (glossary)]] | ||
:[[ | :[[Derived Requirement (glossary)]] | ||
:[[ | :[[Descriptive Model (glossary)]] | ||
:[[ | :[[Design (glossary)]] | ||
:[[ | :[[Design Factor (glossary)]] | ||
:[[ | :[[Design Life (glossary)]] | ||
:[[ | :[[Design Property (glossary)]] | ||
:[[ | :[[DevOps (glossary)]] | ||
:[[ | :[[Digital Elevation Model (glossary)]] | ||
:[[ | :[[Digital Terrain Model (DTM) (glossary)]] | ||
:[[ | :[[Digital Twin (glossary)]] | ||
:[[ | :[[Disposal (glossary)]] | ||
:[[ | :[[Disruption (glossary)]] | ||
:[[ | :[[Diversity (glossary)]] | ||
:[[ | :[[Domain (glossary)]] | ||
:[[ | :[[Drift Correction (glossary)]] | ||
:[[ | :[[Drift Correction (glossary)]] | ||
:[[ | :[[Dualism (glossary)]] | ||
;E | ;E | ||
:[[ | :[[E-Services (glossary)]] | ||
:[[ | :[[Effectiveness (glossary)]] | ||
:[[ | :[[Element (glossary)]] | ||
:[[ | :[[Ellipsoid (glossary)]] | ||
:[[ | :[[Ellipsoidal Height or Geodetic Height (glossary)]] | ||
:[[ | :[[Emergence (glossary)]] | ||
:[[ | :[[Emergent Behavior (glossary)]] | ||
:[[ | :[[Emergent Property (glossary)]] | ||
:[[ | :[[Enabling System (glossary)]] | ||
:[[ | :[[Encapsulation (glossary)]] | ||
:[[ | :[[Engineered System (glossary)]] | ||
:[[ | :[[Engineering (glossary)]] | ||
:[[ | :[[Engineering Change Management (glossary)]] | ||
:[[ | :[[Engineering Change Proposal (ECP) (glossary)]] | ||
:[[ | :[[Engineering Coordinate Reference System (glossary)]] | ||
:[[ | :[[Enterprise (glossary)]] | ||
:[[ | :[[Enterprise Architecture (glossary)]] | ||
:[[ | :[[Enterprise System (glossary)]] | ||
:[[ | :[[Enterprise Systems Engineering (ESE) (glossary)]] | ||
:[[ | :[[Entropy (glossary)]] | ||
:[[ | :[[Environment (glossary)]] | ||
:[[ | :[[Equity (glossary)]] | ||
:[[ | :[[Ethics (glossary)]] | ||
:[[ | :[[Evolutionary (glossary)]] | ||
:[[ | :[[Executable System Model (glossary)]] | ||
:[[ | :[[Extended Enterprise (glossary)]] | ||
;F | ;F | ||
:[[ | :[[Failure (glossary)]] | ||
:[[ | :[[Failure Modes and Effects Criticality Analysis (glossary)]] | ||
:[[ | :[[Feature (glossary)]] | ||
:[[ | :[[Feature attribute (glossary)]] | ||
:[[ | :[[Feature Catalog (glossary)]] | ||
:[[ | :[[Feature catalogue (glossary)]] | ||
:[[ | :[[Federation of Systems (FoS) (glossary)]] | ||
:[[ | :[[Flexibility (glossary)]] | ||
:[[ | :[[Form, Fit, Function, and Interface (F3I) (glossary)]] | ||
:[[ | :[[Framework (glossary)]] | ||
:[[ | :[[Function (glossary)]] | ||
:[[ | :[[Functional Architecture (glossary)]] | ||
:[[ | :[[Functional redundancy (glossary)]] | ||
;G | ;G | ||
:[[ | :[[Gazetteer (glossary)]] | ||
:[[ | :[[General System Theory (glossary)]] | ||
:[[ | :[[Geodesic or Geodesic Line (glossary)]] | ||
:[[ | :[[Geodesy (glossary)]] | ||
:[[ | :[[Geodetic Coordinate System (glossary)]] | ||
:[[ | :[[Geodetic Datum (glossary)]] | ||
:[[ | :[[Geodetic Reference Frame (glossary)]] | ||
:[[ | :[[Geographic coordinates (glossary)]] | ||
:[[ | :[[Geographic Data (glossary)]] | ||
:[[ | :[[Geographic Identifier (glossary)]] | ||
:[[ | :[[Geographic Imagery (glossary)]] | ||
:[[ | :[[Geographic Information (glossary)]] | ||
:[[ | :[[Geographic Information System (glossary)]] | ||
:[[ | :[[Geoid (glossary)]] | ||
:[[ | :[[GEOINT (glossary)]] | ||
:[[ | :[[Geopositioning (glossary)]] | ||
:[[Glossary:Principle | :[[Glossary:Principle]] | ||
:[[ | :[[Governance (glossary)]] | ||
:[[ | :[[Gravity-Related Height (glossary)]] | ||
:[[ | :[[Green Engineering (glossary)]] | ||
;H | ;H | ||
:[[ | :[[Habitability (glossary)]] | ||
:[[ | :[[Hard System (glossary)]] | ||
:[[ | :[[Hardware-in-the-Loop Testing (glossary)]] | ||
:[[ | :[[Healthcare (glossary)]] | ||
:[[ | :[[Healthcare Systems Engineering (glossary)]] | ||
:[[ | :[[Height (glossary)]] | ||
:[[ | :[[Heuristic (glossary)]] | ||
:[[ | :[[Hierarchy (glossary)]] | ||
:[[ | :[[High Reliability Organizations (HROs) (glossary)]] | ||
:[[ | :[[Holism (glossary)]] | ||
:[[ | :[[Holistic (glossary)]] | ||
:[[ | :[[Homeostasis (glossary)]] | ||
:[[ | :[[Human Factors (glossary)]] | ||
:[[ | :[[Human in the loop (glossary)]] | ||
:[[ | :[[Human Survivability (glossary)]] | ||
:[[ | :[[Human Systems Integration (HSI) (glossary)]] | ||
:[[ | :[[Hydrography (glossary)]] | ||
;I | ;I | ||
:[[ | :[[Implementation (glossary)]] | ||
:[[ | :[[In-Process Validation (glossary)]] | ||
:[[ | :[[Inclusion (glossary)]] | ||
:[[ | :[[Increment (glossary)]] | ||
:[[ | :[[Incremental (glossary)]] | ||
:[[ | :[[Industrial Engineering (glossary)]] | ||
:[[ | :[[Information and Communications Technologies (ICT) (glossary)]] | ||
:[[ | :[[Information Category (glossary)]] | ||
:[[ | :[[Information Need (glossary)]] | ||
:[[ | :[[Information Technology (glossary)]] | ||
:[[ | :[[Infrastructure (glossary)]] | ||
:[[ | :[[Input (glossary)]] | ||
:[[ | :[[Input-Output Flow (glossary)]] | ||
:[[ | :[[Installation (glossary)]] | ||
:[[ | :[[Integrated Product Team (IPT) (glossary)]] | ||
:[[ | :[[Integration (glossary)]] | ||
:[[ | :[[Integrity (glossary)]] | ||
:[[ | :[[Inter-Node Interaction (glossary)]] | ||
:[[ | :[[Interface (glossary)]] | ||
:[[ | :[[Internal Coordinate Reference System (glossary)]] | ||
:[[ | :[[Internode Interaction (glossary)]] | ||
:[[ | :[[Interoperability (glossary)]] | ||
:[[ | :[[Issue (glossary)]] | ||
:[[ | :[[Iteration (glossary)]] | ||
;K | ;K | ||
:[[ | :[[Knowledge (glossary)]] | ||
;L | ;L | ||
:[[ | :[[Land Cover (glossary)]] | ||
:[[ | :[[Land Use (glossary)]] | ||
:[[ | :[[Latent (glossary)]] | ||
:[[ | :[[Layer (glossary)]] | ||
:[[ | :[[Leader (glossary)]] | ||
:[[ | :[[Lean Systems Engineering (LSE) (glossary)]] | ||
:[[ | :[[Lean Value Stream Mapping (glossary)]] | ||
:[[ | :[[Legacy System (glossary)]] | ||
:[[ | :[[Leverage (glossary)]] | ||
:[[ | :[[Life Cycle (glossary)]] | ||
:[[ | :[[Life Cycle Cost (LCC) (glossary)]] | ||
:[[ | :[[Life Cycle Management (glossary)]] | ||
:[[ | :[[Life Cycle Model (glossary)]] | ||
:[[ | :[[Life Cycle Process (glossary)]] | ||
:[[ | :[[Localized Capacity (glossary)]] | ||
:[[ | :[[Location (glossary)]] | ||
:[[ | :[[Location-Based Service (LBS) (glossary)]] | ||
:[[ | :[[Logical Architecture (glossary)]] | ||
:[[ | :[[Logistics (glossary)]] | ||
:[[ | :[[Loose Coupling (glossary)]] | ||
:[[ | :[[Loss-Driven Systems Engineering (glossary)]] | ||
;M | ;M | ||
:[[ | :[[Maintainability (glossary)]] | ||
:[[ | :[[Maintenance (glossary)]] | ||
:[[ | :[[Manpower (glossary)]] | ||
:[[ | :[[Map (glossary)]] | ||
:[[ | :[[Map Projection (glossary)]] | ||
:[[ | :[[Market Analysis (glossary)]] | ||
:[[ | :[[Mean Sea Level(glossary)]] | ||
:[[ | :[[Measurable Concept (glossary)]] | ||
:[[ | :[[Measure (glossary)]] | ||
:[[ | :[[Measure of Effectiveness (MoE) (glossary)]] | ||
:[[ | :[[Measure of Performance (MoP) (glossary)]] | ||
:[[ | :[[Measurement (glossary)]] | ||
:[[ | :[[Meta-model (glossary)]] | ||
:[[ | :[[Metadata (glossary)]] | ||
:[[ | :[[Metric (glossary)]] | ||
:[[ | :[[Milestone (glossary)]] | ||
:[[ | :[[Mission (glossary)]] | ||
:[[ | :[[Mission Analysis (glossary)]] | ||
:[[ | :[[Mission Engineering (glossary)]] | ||
:[[ | :[[Model (glossary)]] | ||
:[[ | :[[Model Management (glossary)]] | ||
:[[ | :[[Model Transformation (glossary)]] | ||
:[[ | :[[Model Validation (glossary)]] | ||
:[[ | :[[Model-Based Systems Engineering (MBSE) (glossary)]] | ||
:[[ | :[[Modeling Language (glossary)]] | ||
:[[ | :[[Modeling Tool (glossary)]] | ||
:[[ | :[[Modularity (glossary)]] | ||
:[[ | :[[Motion (glossary)]] | ||
;N | ;N | ||
:[[ | :[[Natural System (glossary)]] | ||
:[[ | :[[Nautical Chart (glossary)]] | ||
:[[ | :[[Navigation (glossary)]] | ||
:[[ | :[[Network (glossary)]] | ||
:[[ | :[[Neutral State (glossary)]] | ||
:[[ | :[[Node (glossary)]] | ||
:[[ | :[[Non-Functional Requirements (glossary)]] | ||
;O | ;O | ||
:[[ | :[[Occupational Health (glossary)]] | ||
:[[ | :[[Ontology (glossary)]] | ||
:[[ | :[[Open System (glossary)]] | ||
:[[ | :[[Operational (glossary)]] | ||
:[[ | :[[Operational Capability (glossary)]] | ||
:[[ | :[[Operational Concept (glossary)]] | ||
:[[ | :[[Operational Environment (glossary)]] | ||
:[[ | :[[Operational Mode (glossary)]] | ||
:[[ | :[[Operational Scenario (glossary)]] | ||
:[[ | :[[Operations Research (glossary)]] | ||
:[[ | :[[Opportunity (glossary)]] | ||
:[[ | :[[Organization (glossary)]] | ||
:[[ | :[[Organizational (glossary)]] | ||
:[[ | :[[Organizational Capability (glossary)]] | ||
:[[ | :[[Orthoimage (glossary)]] | ||
:[[ | :[[Output (glossary)]] | ||
;P | ;P | ||
:[[ | :[[Paradigm (glossary)]] | ||
:[[ | :[[Pattern (glossary)]] | ||
:[[ | :[[Personnel (glossary)]] | ||
:[[ | :[[Physical Architecture (glossary)]] | ||
:[[ | :[[Physical Interface (glossary)]] | ||
:[[ | :[[Physical Model (glossary)]] | ||
:[[ | :[[Physical redundancy (glossary)]] | ||
:[[ | :[[Plan (glossary)]] | ||
:[[ | :[[Pluralist (glossary)]] | ||
:[[ | :[[Portfolio (glossary)]] | ||
:[[ | :[[Portfolio Management (glossary)]] | ||
:[[ | :[[Portrayal (glossary)]] | ||
:[[ | :[[Positional accuracy (glossary)]] | ||
:[[ | :[[Postal address type (glossary)]] | ||
:[[ | :[[Postmodernist (glossary)]] | ||
:[[ | :[[Praxis (glossary)]] | ||
:[[ | :[[Preliminary Design Review (PDR) (glossary)]] | ||
:[[ | :[[Principle (glossary)]] | ||
:[[ | :[[Problem (glossary)]] | ||
:[[ | :[[Process (glossary)]] | ||
:[[ | :[[Procurement (glossary)]] | ||
:[[ | :[[Product (glossary)]] | ||
:[[ | :[[Product System (glossary)]] | ||
:[[ | :[[Program (glossary)]] | ||
:[[ | :[[Program Management (glossary)]] | ||
:[[ | :[[Project (glossary)]] | ||
:[[ | :[[Project Management (glossary)]] | ||
:[[ | :[[Prototype (glossary)]] | ||
:[[ | :[[Proving (glossary)]] | ||
:[[ | :[[Purpose (glossary)]] | ||
:[[ | :[[Purposeful (glossary)]] | ||
:[[ | :[[Purposive (glossary)]] | ||
;Q | ;Q | ||
:[[ | :[[Qualification (glossary)]] | ||
:[[ | :[[Quality (glossary)]] | ||
;R | ;R | ||
:[[ | :[[Rationale (glossary)]] | ||
:[[ | :[[Recovery (glossary)]] | ||
:[[ | :[[Recursion (glossary)]] | ||
:[[ | :[[Reductionism (glossary)]] | ||
:[[ | :[[Redundancy (glossary)]] | ||
:[[ | :[[Regularity (glossary)]] | ||
:[[ | :[[Reliability (glossary)]] | ||
:[[ | :[[Remote sensing (glossary)]] | ||
:[[ | :[[Reparability (glossary)]] | ||
:[[ | :[[Requirement (glossary)]] | ||
:[[ | :[[Resilience (glossary)]] | ||
:[[ | :[[Resolution (of imagery) (glossary)]] | ||
:[[ | :[[Restructuring (glossary)]] | ||
:[[ | :[[Reverse Engineering (glossary)]] | ||
:[[ | :[[Rhumb Line (glossary)]] | ||
:[[ | :[[Risk (glossary)]] | ||
:[[ | :[[Risk Management (glossary)]] | ||
:[[ | :[[Robustness (glossary)]] | ||
:[[ | :[[Routing (glossary)]] | ||
;S | ;S | ||
:[[ | :[[Safety (glossary)]] | ||
:[[ | :[[Satellite Positioning System (glossary)]] | ||
:[[ | :[[Scalability (glossary)]] | ||
:[[ | :[[Scenario (glossary)]] | ||
:[[ | :[[Scope (glossary)]] | ||
:[[ | :[[Security (glossary)]] | ||
:[[ | :[[Semantic Interoperability (glossary)]] | ||
:[[ | :[[Semantics (glossary)]] | ||
:[[ | :[[Service (glossary)]] | ||
:[[ | :[[Service Life Extension (SLE) (glossary)]] | ||
:[[ | :[[Service Science (glossary)]] | ||
:[[ | :[[Service System (glossary)]] | ||
:[[ | :[[Service Systems Engineering (glossary)]] | ||
:[[ | :[[Service Value Chain (glossary)]] | ||
:[[ | :[[Set Driver (glossary)]] | ||
:[[ | :[[Set Modifiers (glossary)]] | ||
:[[ | :[[Set-Based Design (glossary)]] | ||
:[[ | :[[Simulation (glossary)]] | ||
:[[ | :[[Simulator (glossary)]] | ||
:[[ | :[[Six Sigma (glossary)]] | ||
:[[ | :[[Social System (glossary)]] | ||
:[[ | :[[Sociotechnical System (glossary)]] | ||
:[[ | :[[Soft System (glossary)]] | ||
:[[ | :[[Soft Systems Methodology (glossary)]] | ||
:[[ | :[[Software (glossary)]] | ||
:[[ | :[[Software Assurance (glossary)]] | ||
:[[ | :[[Software Engineering (glossary)]] | ||
:[[ | :[[Software System (glossary)]] | ||
:[[ | :[[Software-in-the-Loop Testing (glossary)]] | ||
:[[ | :[[Solution (glossary)]] | ||
:[[ | :[[Spatial Reference (glossary)]] | ||
:[[ | :[[Spatial Reference System (glossary)]] | ||
:[[ | :[[Spatial Reference (glossary)]] | ||
:[[ | :[[Specialty Engineering (glossary)]] | ||
:[[ | :[[Stage (glossary)]] | ||
:[[ | :[[Stakeholder (glossary)]] | ||
:[[ | :[[Stakeholder Needs and Requirements (glossary)]] | ||
:[[ | :[[State (glossary)]] | ||
:[[ | :[[Statistical Process Control (glossary)]] | ||
:[[ | :[[Structure (glossary)]] | ||
:[[ | :[[Supplier (glossary)]] | ||
:[[ | :[[Survivability (glossary)]] | ||
:[[ | :[[Sustainment (glossary)]] | ||
:[[ | :[[Synectics (glossary)]] | ||
:[[ | :[[Synergy (glossary)]] | ||
:[[ | :[[Synthesis (glossary)]] | ||
:[[ | :[[System (glossary)]] | ||
:[[ | :[[System Analysis (glossary)]] | ||
:[[ | :[[System Assurance (glossary)]] | ||
:[[ | :[[System Boundary (glossary)]] | ||
:[[ | :[[System Breakdown Structure (glossary)]] | ||
:[[ | :[[System Capability (glossary)]] | ||
:[[ | :[[System Context (glossary)]] | ||
:[[ | :[[System Coupling Diagram (glossary)]] | ||
:[[ | :[[System Definition (glossary)]] | ||
:[[ | :[[System Deployment and Use (glossary)]] | ||
:[[ | :[[System Element (glossary)]] | ||
:[[ | :[[System Hardware Assurance]] | ||
:[[ | :[[System of Systems (SoS) (glossary)]] | ||
:[[ | :[[System Property (glossary)]] | ||
:[[ | :[[System Realization (glossary)]] | ||
:[[ | :[[System Requirement (glossary)]] | ||
:[[ | :[[System-of-Interest (glossary)]] | ||
:[[ | :[[Systemist (glossary)]] | ||
:[[ | :[[Systems Approach (glossary)]] | ||
:[[ | :[[Systems Biology (glossary)]] | ||
:[[ | :[[Systems Concept (glossary)]] | ||
:[[ | :[[Systems Development (glossary)]] | ||
:[[ | :[[Systems Engineer (glossary)]] | ||
:[[ | :[[Systems Engineering (glossary)]] | ||
:[[ | :[[Systems Engineering Management (SEM) (glossary)]] | ||
:[[ | :[[Systems Engineering Plan (SEP) (glossary)]] | ||
:[[ | :[[Systems Integration (glossary)]] | ||
:[[ | :[[Systems Science (glossary)]] | ||
:[[ | :[[Systems Thinking (glossary)]] | ||
;T | ;T | ||
:[[ | :[[Tailoring (glossary)]] | ||
:[[ | :[[Team (glossary)]] | ||
:[[ | :[[Technical Management (glossary)]] | ||
:[[ | :[[Technical Performance Measure (TPM) (glossary)]] | ||
:[[ | :[[Temporal Architecture (glossary)]] | ||
:[[ | :[[Test Cases (glossary)]] | ||
:[[ | :[[Threat (glossary)]] | ||
:[[ | :[[Tolerance (glossary)]] | ||
:[[ | :[[Total Ownership Cost (glossary)]] | ||
:[[ | :[[Traceability (glossary)]] | ||
:[[ | :[[Training (glossary)]] | ||
:[[ | :[[Transition of Modes (glossary)]] | ||
:[[ | :[[Transport network (glossary)]] | ||
;U | ;U | ||
:[[ | :[[Uncertainty (glossary)]] | ||
:[[ | :[[Unitary (glossary)]] | ||
:[[ | :[[Use Case (glossary)]] | ||
:[[ | :[[Useful life (glossary)]] | ||
:[[ | :[[User (glossary)]] | ||
:[[ | :[[Utility network (glossary)]] | ||
;V | ;V | ||
:[[ | :[[Validation (glossary)]] | ||
:[[ | :[[Value (glossary)]] | ||
:[[ | :[[Variety (glossary)]] | ||
:[[ | :[[Vee (V) Model (glossary)]] | ||
:[[ | :[[Verification (glossary)]] | ||
:[[ | :[[Verification and Validation Action (glossary)]] | ||
:[[ | :[[Verification and Validation Configuration (glossary)]] | ||
:[[ | :[[Verification and Validation Procedure (glossary)]] | ||
:[[ | :[[Verification and Validation Tool (glossary)]] | ||
:[[ | :[[Viable (glossary)]] | ||
:[[ | :[[View (glossary)]] | ||
:[[ | :[[Viewpoint (glossary)]] | ||
:[[ | :[[Vignette (glossary)]] | ||
;W | ;W | ||
:[[ | :[[White-Box System (glossary)]] | ||
:[[ | :[[Wicked Problem (glossary)]] | ||
;Acronyms | ;Acronyms | ||
:[[Acronyms]] | :[[Acronyms]] | ||
[[Category:Books|SEBoK Glossary and Acronyms]] | [[Category:Books|SEBoK Glossary and Acronyms]] |
Latest revision as of 14:04, 28 May 2025
This template is used for saving PDF setup information for the SEBoK. Edit this book: Book Creator · Wikitext
SEBoK Glossary and Acronyms
- Glossary
- A
- absorption
- abstract model
- abstract syntax
- abstraction
- acceptance criteria
- acceptance sampling
- acquirer
- acquisition
- acquisition strategy
- adaptability
- address
- adversity
- aggregate
- agile
- agility
- agreement
- analytical model
- antipattern
- architecting
- architecture
- architecture framework
- assembly procedure
- assembly tool
- assessment criterion
- assessment score
- attribute
- availability
- B
- baseline
- behavior
- behavioral architecture
- binding
- black-box system
- body of knowledge
- boundary
- business
- business process
- business process outsourcing
- C
- call center
- capability
- capability management
- capacity
- cartesian coordinate system
- cartography
- case study
- catalogue
- chaos
- closed system
- coercive
- cognitive bias
- cohesion
- competency
- complex
- complex adaptive system (cas)
- complexity
- complexity avoidance
- component
- computer simulation
- concept
- concept definition
- concept of operations (conops)
- concrete syntax
- concurrent
- concurrently
- configuration
- configuration management
- constraint
- control
- coordinate
- cost
- critical design review (cdr)
- critical systems thinking
- culture
- customer
- cyber-physical systems
- cybernetics
- cycle
- D
- data center
- decision gate
- decision management
- defense in depth
- demonstration
- derived requirement
- descriptive model
- design
- design factor
- design life
- design property
- devops
- digital elevation model
- digital terrain model (dtm)
- digital twin
- disposal
- disruption
- diversity
- domain
- drift correction
- drift correction
- dualism
- E
- e-services
- effectiveness
- element
- ellipsoid
- ellipsoidal height or geodetic height
- emergence
- emergent behavior
- emergent property
- enabling system
- encapsulation
- engineered system
- engineering
- engineering change management
- engineering change proposal (ecp)
- engineering coordinate reference system
- enterprise
- enterprise architecture
- enterprise system
- enterprise systems engineering (ese)
- entropy
- environment
- equity
- ethics
- evolutionary
- executable system model
- extended enterprise
- F
- failure
- failure modes and effects criticality analysis
- feature
- feature attribute
- feature catalog
- feature catalogue
- federation of systems (fos)
- flexibility
- form, fit, function, and interface (f3i)
- framework
- function
- functional architecture
- functional redundancy
- G
- gazetteer
- general system theory
- geodesic or geodesic line
- geodesy
- geodetic coordinate system
- geodetic datum
- geodetic reference frame
- geographic coordinates
- geographic data
- geographic identifier
- geographic imagery
- geographic information
- geographic information system
- geoid
- geoint
- geopositioning
- Glossary:Principle
- governance
- gravity-related height
- green engineering
- H
- habitability
- hard system
- hardware-in-the-loop testing
- healthcare
- healthcare systems engineering
- height
- heuristic
- hierarchy
- high reliability organizations (hros)
- holism
- holistic
- homeostasis
- human factors
- human in the loop
- human survivability
- human systems integration (hsi)
- hydrography
- I
- implementation
- in-process validation
- inclusion
- increment
- incremental
- industrial engineering
- information and communications technologies (ict)
- information category
- information need
- information technology
- infrastructure
- input
- input-output flow
- installation
- integrated product team (ipt)
- integration
- integrity
- inter-node interaction
- interface
- internal coordinate reference system
- internode interaction
- interoperability
- issue
- iteration
- K
- knowledge
- L
- land cover
- land use
- latent
- layer
- leader
- lean systems engineering (lse)
- lean value stream mapping
- legacy system
- leverage
- life cycle
- life cycle cost (lcc)
- life cycle management
- life cycle model
- life cycle process
- localized capacity
- location
- location-based service (lbs)
- logical architecture
- logistics
- loose coupling
- loss-driven systems engineering
- M
- maintainability
- maintenance
- manpower
- map
- map projection
- market analysis
- mean sea level
- measurable concept
- measure
- measure of effectiveness (moe)
- measure of performance (mop)
- measurement
- meta-model
- metadata
- metric
- milestone
- mission
- mission analysis
- mission engineering
- model
- model management
- model transformation
- model validation
- model-based systems engineering (mbse)
- modeling language
- modeling tool
- modularity
- motion
- N
- natural system
- nautical chart
- navigation
- network
- neutral state
- node
- non-functional requirements
- O
- occupational health
- ontology
- open system
- operational
- operational capability
- operational concept
- operational environment
- operational mode
- operational scenario
- operations research
- opportunity
- organization
- organizational
- organizational capability
- orthoimage
- output
- P
- paradigm
- pattern
- personnel
- physical architecture
- physical interface
- physical model
- physical redundancy
- plan
- pluralist
- portfolio
- portfolio management
- portrayal
- positional accuracy
- postal address type
- postmodernist
- praxis
- preliminary design review (pdr)
- principle
- problem
- process
- procurement
- product
- product system
- program
- program management
- project
- project management
- prototype
- proving
- purpose
- purposeful
- purposive
- Q
- qualification
- quality
- R
- rationale
- recovery
- recursion
- reductionism
- redundancy
- regularity
- reliability
- remote sensing
- reparability
- requirement
- resilience
- resolution (of imagery)
- restructuring
- reverse engineering
- rhumb line
- risk
- risk management
- robustness
- routing
- S
- safety
- satellite positioning system
- scalability
- scenario
- scope
- security
- semantic interoperability
- semantics
- service
- service life extension (sle)
- service science
- service system
- service systems engineering
- service value chain
- set driver
- set modifiers
- set-based design
- simulation
- simulator
- six sigma
- social system
- sociotechnical system
- soft system
- soft systems methodology
- software
- software assurance
- software engineering
- software system
- software-in-the-loop testing
- solution
- spatial reference
- spatial reference system
- spatial reference
- specialty engineering
- stage
- stakeholder
- stakeholder needs and requirements
- state
- statistical process control
- structure
- supplier
- survivability
- sustainment
- synectics
- synergy
- synthesis
- system
- system analysis
- system assurance
- system boundary
- system breakdown structure
- system capability
- system context
- system coupling diagram
- system definition
- system deployment and use
- system element
- System Hardware Assurance
- system of systems (sos)
- system property
- system realization
- system requirement
- system-of-interest
- systemist
- systems approach
- systems biology
- systems concept
- systems development
- systems engineer
- systems engineering
- systems engineering management (sem)
- systems engineering plan (sep)
- systems integration
- systems science
- systems thinking
- T
- tailoring
- team
- technical management
- technical performance measure (tpm)
- temporal architecture
- test cases
- threat
- tolerance
- total ownership cost
- traceability
- training
- transition of modes
- transport network
- U
- uncertainty
- unitary
- use case
- useful life
- user
- utility network
- V
- validation
- value
- variety
- vee (v) model
- verification
- verification and validation action
- verification and validation configuration
- verification and validation procedure
- verification and validation tool
- viable
- view
- viewpoint
- vignette
- W
- white-box system
- wicked problem
- Acronyms
- Acronyms