Failure (glossary): Difference between revisions
(→Source) |
m (Text replacement - "SEBoK v. 2.12, released 20 May 2025" to "SEBoK v. 2.12, released 27 May 2025") |
||
(22 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
<blockquote>(1) ''Termination of the ability of a product to perform a required function or its inability to perform within previously specified limits.'' (ISO/IEC | <blockquote>(1) ''Termination of the ability of a product to perform a required function or its inability to perform within previously specified limits.'' (ISO/IEC 2005, 4.2) </blockquote> | ||
<blockquote>(2) ''An event in which a system or system component does not perform a required function within specified limits. ''(ISO/IEC 2009, 1) </blockquote> | <blockquote>(2) ''An event in which a system or system component does not perform a required function within specified limits.'' (ISO/IEC/IEEE 2009, 1) </blockquote> | ||
<blockquote>(3) ''The event in which any part of an item does not perform as required by its specification. The failure may occur at a value in excess of the minimum required in the specification, i.e., past design limits or beyond the margin of safety.'' (INCOSE | <blockquote>(3) ''The event in which any part of an item does not perform as required by its specification. The failure may occur at a value in excess of the minimum required in the specification, i.e., past design limits or beyond the margin of safety.'' (INCOSE 2012)</blockquote> | ||
===Source=== | |||
(1) | (1) ISO/IEC. 2005. ''Software Engineering - Software Product Quality Requirements and Evaluation (SQuaRE) - Guide to SQuaRE.'' Geneva, Switzerland: International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC). ISO/IEC 25000:2005. | ||
(2) | (2) ISO/IEC/IEEE. 2009. ''Systems and Software Engineering - System and Software Engineering Vocabulary (SEVocab)''. Geneva, Switzerland: International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC)/ Institute of Electrical and Electronics Engineers (IEEE). ISO/IEC/IEEE 24765:2009. | ||
(3) | (3) INCOSE. 2012. ''Systems Engineering Handbook: A Guide for System Life Cycle Processes and Activities'', version 3.2.2. San Diego, CA, USA: International Council on Systems Engineering (INCOSE), INCOSE-TP-2003-002-03.2.2. | ||
===Discussion=== | ===Discussion=== | ||
None. | |||
[[Category:Glossary of Terms]] | [[Category:Glossary of Terms]] | ||
<center>'''SEBoK v. 2.12, released 27 May 2025'''</center> | |||
Latest revision as of 01:06, 24 May 2025
(1) Termination of the ability of a product to perform a required function or its inability to perform within previously specified limits. (ISO/IEC 2005, 4.2)
(2) An event in which a system or system component does not perform a required function within specified limits. (ISO/IEC/IEEE 2009, 1)
(3) The event in which any part of an item does not perform as required by its specification. The failure may occur at a value in excess of the minimum required in the specification, i.e., past design limits or beyond the margin of safety. (INCOSE 2012)
Source
(1) ISO/IEC. 2005. Software Engineering - Software Product Quality Requirements and Evaluation (SQuaRE) - Guide to SQuaRE. Geneva, Switzerland: International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC). ISO/IEC 25000:2005.
(2) ISO/IEC/IEEE. 2009. Systems and Software Engineering - System and Software Engineering Vocabulary (SEVocab). Geneva, Switzerland: International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC)/ Institute of Electrical and Electronics Engineers (IEEE). ISO/IEC/IEEE 24765:2009.
(3) INCOSE. 2012. Systems Engineering Handbook: A Guide for System Life Cycle Processes and Activities, version 3.2.2. San Diego, CA, USA: International Council on Systems Engineering (INCOSE), INCOSE-TP-2003-002-03.2.2.
Discussion
None.