Systems Engineering Concept Model: Difference between revisions

From SEBoK Draft
Jump to navigation Jump to search
m (Text replacement - "'''SEBoK v. 2.1, released 31 October 2019'''" to "'''SEBoK v. 2.2, released 15 May 2020'''")
m (Text replacement - "SEBoK v. 2.12, released 20 May 2025" to "SEBoK v. 2.12, released 27 May 2025")
 
(12 intermediate revisions by 3 users not shown)
Line 7: Line 7:
This reference was the result of a joint effort between INCOSE and members of the AP233 Working Group and the OMG SE DSIG which occurred in 2003. It represents a consensus on the definition of some of the key system modeling concepts.
This reference was the result of a joint effort between INCOSE and members of the AP233 Working Group and the OMG SE DSIG which occurred in 2003. It represents a consensus on the definition of some of the key system modeling concepts.


<center>'''SEBoK v. 2.2, released 15 May 2020'''</center>
<center>'''SEBoK v. 2.12, released 27 May 2025'''</center>


[[Category:Primary Reference]]
[[Category:Primary Reference]]

Latest revision as of 00:25, 24 May 2025

INCOSE. 2003. Systems Engineering Concept Model. Draft 12 Baseline. Seattle, WA, USA: International Council on Systems Engineering. Available at: http://syseng.omg.org/SE_Conceptual%20Model/SE_Conceptual_Model.htm

Usage

This source is considered a primary reference for the System Modeling Concepts article.

Annotation

This reference was the result of a joint effort between INCOSE and members of the AP233 Working Group and the OMG SE DSIG which occurred in 2003. It represents a consensus on the definition of some of the key system modeling concepts.

SEBoK v. 2.12, released 27 May 2025