System Deployment and Use (glossary): Difference between revisions
Jump to navigation
Jump to search
SEBoK v. 2.12, released 27 May 2025
No edit summary |
m (Text replacement - "SEBoK v. 2.12, released 20 May 2025" to "SEBoK v. 2.12, released 27 May 2025") |
||
(18 intermediate revisions by 4 users not shown) | |||
Line 5: | Line 5: | ||
===Discussion=== | ===Discussion=== | ||
[[System Deployment and Use]] is a SEBoK knowledge area; it includes systems engineering activities for system deployment and operation in its operational environment; and for the maintenance and logistics support of the system through life. | |||
<center>'''SEBoK v. 2.12, released 27 May 2025'''</center> | |||
[[Category:Glossary of Terms]] | [[Category:Glossary of Terms]] |
Latest revision as of 00:14, 24 May 2025
A set of core technical activities of systems engineering in ensure that the developed system is operationally acceptable and that the responsibility for the effective, efficient, and safe operations of the system is transferred to the owner. Considerations for deployment and use must be included throughout the system life cycle. (Created for SEBoK)
Source
This definition was developed for the SEBoK.
Discussion
System Deployment and Use is a SEBoK knowledge area; it includes systems engineering activities for system deployment and operation in its operational environment; and for the maintenance and logistics support of the system through life.