Measure of Performance (MoP) (glossary): Difference between revisions

From SEBoK Draft
Jump to navigation Jump to search
No edit summary
m (Text replacement - "SEBoK v. 2.12, released 20 May 2025" to "SEBoK v. 2.12, released 27 May 2025")
 
(21 intermediate revisions by 5 users not shown)
Line 1: Line 1:
<blockquote>''An engineering performance measure that provides design requirements that are necessary to satisfy an MOE.'' (IEEE 1220-2005 IEEE Standard for the Application and Management of the Systems Engineering Process, 3.1.24)</blockquote>  
<blockquote>''An engineering performance measure that provides design requirements that are necessary to satisfy an MOE (measure of effectiveness).'' (IEEE 2005)</blockquote>  


====Source(s)====
===Sources===
IEEE. 2005. ''IEEE Standard for Application and Management of the Systems Engineering Process.'' New York, NY, USA: Institute for Electrical and Electronics Engineers (IEEE). IEEE 1220-2005.  
IEEE. 2005. ''IEEE Standard for Application and Management of the Systems Engineering Process.'' New York, NY, USA: Institute for Electrical and Electronics Engineers (IEEE). IEEE 1220-2005.  


===Discussion===
===Discussion===
There is currently no discussion for this term.  This will be completed for SEBoK version 1.0.
None.


[[Category:Glossary of Terms]]
[[Category:Glossary of Terms]]
{{DISQUS}}
<center>'''SEBoK v. 2.12, released 27 May 2025'''</center>

Latest revision as of 23:39, 23 May 2025

An engineering performance measure that provides design requirements that are necessary to satisfy an MOE (measure of effectiveness). (IEEE 2005)

Sources

IEEE. 2005. IEEE Standard for Application and Management of the Systems Engineering Process. New York, NY, USA: Institute for Electrical and Electronics Engineers (IEEE). IEEE 1220-2005.

Discussion

None.

SEBoK v. 2.12, released 27 May 2025