System Deployment and Use (glossary): Difference between revisions
Jump to navigation
Jump to search
SEBoK v. 2.4, released 19 May 2021
m (Text replacement - "'''SEBoK v. 2.2, released 15 May 2020'''" to "'''SEBoK v. 2.3, released 30 October 2020'''") |
m (Text replacement - "<center>'''SEBoK v. 2.3, released 30 October 2020'''</center>" to "<center>'''SEBoK v. 2.4, released 19 May 2021'''</center>") |
||
Line 7: | Line 7: | ||
[[System Deployment and Use]] is a SEBoK knowledge area; it includes systems engineering activities for system deployment and operation in its operational environment; and for the maintenance and logistics support of the system through life. | [[System Deployment and Use]] is a SEBoK knowledge area; it includes systems engineering activities for system deployment and operation in its operational environment; and for the maintenance and logistics support of the system through life. | ||
<center>'''SEBoK v. 2. | <center>'''SEBoK v. 2.4, released 19 May 2021'''</center> | ||
[[Category:Glossary of Terms]] | [[Category:Glossary of Terms]] |
Revision as of 00:51, 19 May 2021
A set of core technical activities of systems engineering in ensure that the developed system is operationally acceptable and that the responsibility for the effective, efficient, and safe operations of the system is transferred to the owner. Considerations for deployment and use must be included throughout the system life cycle. (Created for SEBoK)
Source
This definition was developed for the SEBoK.
Discussion
System Deployment and Use is a SEBoK knowledge area; it includes systems engineering activities for system deployment and operation in its operational environment; and for the maintenance and logistics support of the system through life.